Browsing by Subject Scheduling

Jump to: 0-9 A B C D E F G H I J K L M N O P Q R S T U V W X Y Z
or enter first few letters:  
Showing results 1 to 5 of 5
Issue DateTitleAuthor(s)
27-Oct-2006Applying machine-based decomposition in 2 machine flow shopsMukherjee, Saral; Chatterjee, A. K.
2014Chartered speed private limited : BRTS Ahmedabad a race against timeJoy, John; Malhotra, Vaibhav
8-Nov-2007On the representation of the one machine sequencing problem in the shifting bottleneck heuristicMukherjee, Saral; Chatterjee, A. K.
1988Preventive maintenance scheduling systemSankaran, G.
20-Jul-2010Unified concept of bottleneckMukherjee, Saral; Chatterjee, A. K.