Please use this identifier to cite or link to this item:
http://hdl.handle.net/11718/1199
Title: | Reliability analysis of APOLY-12-PU-500 windmills |
Authors: | Sharan, Girja Shah, Nitin R. Srivastava, U. K. |
Keywords: | Windmiils - Breakdown data - Gujarat;APOLY-12-PU-500, WIndmills - Gujarat |
Issue Date: | 14-Mar-2010 |
Series/Report no.: | WP;1986/613 |
Abstract: | Breakdown data of APOLY-12-PU-500 windmills of Gujarat has been analysed. Bartlett's test suggested the plausibility of failure being exponentially distributed. The mean-time-between-failure (MTBF) was estimated, expected failure frequency computed. The observed and expected frequencies are close enough, as indicated by the goodness-of-fit test. The MTBF worked out to be 283 hours which in Gujarat conditions could mean at the most 2 months of working. The reliability of this model thus is low. Repair costs will be higher than expected by the designers. |
URI: | http://hdl.handle.net/11718/1199 |
Appears in Collections: | Working Papers |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
WP 1986_613.pdf | 195.5 kB | Adobe PDF | View/Open |
Items in IIMA Institutional Repository are protected by copyright, with all rights reserved, unless otherwise indicated.