Please use this identifier to cite or link to this item:
http://hdl.handle.net/11718/13128
Title: | Decision support system for production scheduling at the Kandla plant of IFFCO |
Authors: | Bamba, Ashish Chatterjee, Purnajit |
Keywords: | Production scheduling;Decision support system;IFFCO;Indian Fertiliser |
Issue Date: | 1988 |
Publisher: | Indian Institute of Management Ahmedabad |
Series/Report no.: | SP;127 |
Abstract: | The problem of production scheduling at the Kandla plant of IFFCO was studied. A decision support system was developed to determined which grade to produce at a given time and to produce it for how long a time period. DSS developed was aimed to satisfy ECA allocation (demand constraints), storage constraints etc. |
URI: | http://hdl.handle.net/11718/13128 |
Appears in Collections: | Student Projects |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
SP 1988_127.pdf Restricted Access | Student Project | 1.52 MB | Adobe PDF | View/Open Request a copy |
Items in IIMA Institutional Repository are protected by copyright, with all rights reserved, unless otherwise indicated.