Please use this identifier to cite or link to this item: http://hdl.handle.net/11718/13399
Full metadata record
DC FieldValueLanguage
dc.contributor.advisorRao, V. Venkata
dc.contributor.authorSankaran, G.
dc.date.accessioned2015-04-24T09:35:56Z
dc.date.available2015-04-24T09:35:56Z
dc.date.copyright1988
dc.date.issued1988
dc.identifier.urihttp://hdl.handle.net/11718/13399
dc.descriptionThe objective of the project was to design and implement the preventive maintenance scheduling system for machines which is being computerized by Anil Synthetics Ltd., Ahmedabad. The system envisaged was mainly one which would help the production departments to streamline their preventive maintenance activities. The reports generated from this system would help focus the attention of the people responsible on to those machines where there has been an inordinate delay in doing preventive maintenance. A comparative study of breakdown of the machines prior to and after implementation of this system will highlight those machines where improvements in performance are possible through better maintenance.en_US
dc.language.isoenen_US
dc.publisherIndian Institute of Management (Ahmedabad)en_US
dc.relation.ispartofseriesSP;96
dc.subjectMaintenanceen_US
dc.subjectSchedulingen_US
dc.titlePreventive maintenance scheduling systemen_US
dc.typeStudent Projecten_US
Appears in Collections:Student Projects

Files in This Item:
File Description SizeFormat 
SP 1988_96.pdf
  Restricted Access
Student Project1.55 MBAdobe PDFView/Open Request a copy


Items in IIMA Institutional Repository are protected by copyright, with all rights reserved, unless otherwise indicated.