Please use this identifier to cite or link to this item: http://hdl.handle.net/11718/1495
Full metadata record
DC FieldValueLanguage
dc.contributor.authorRaghunathan, V.-
dc.contributor.authorSrinivasan, G.-
dc.date.accessioned2010-03-22T05:07:11Z-
dc.date.available2010-03-22T05:07:11Z-
dc.date.copyright1987-04-
dc.date.issued2010-03-22T05:07:11Z-
dc.identifier.urihttp://hdl.handle.net/11718/1495-
dc.description.abstractTwo alternative specifications of weighted average cost of capital are prevalent in finance literature. Though both the specifications result in consistent accept/reject or ranking decisions the net present value arrived is different under each method. This paper traces the origin of this difference and resolves the same. It is shown that if projects are funded in such a way that resulting debt to equity is the optimal leverage then both specifications will yield identical net present values. In cases where such capital structure maintenance is not feasible there is loss of value due to unused debt capacity. We arrive at a lower bound for such a loss and also show that in such situations there exists a possibility of a synergy between projects which are otherwise independent.en
dc.language.isoenen
dc.relation.ispartofseriesWP;1987/669-
dc.subjectCapital structureen
dc.subjectdebt maintenanceen
dc.titleTarget debt maintenance under alternative net present value specifications and implications for investment and finance decisionsen
dc.typeWorking Paperen
Appears in Collections:Working Papers

Files in This Item:
File Description SizeFormat 
WP 1987_669.pdf311.83 kBAdobe PDFView/Open


Items in IIMA Institutional Repository are protected by copyright, with all rights reserved, unless otherwise indicated.