Please use this identifier to cite or link to this item: http://hdl.handle.net/11718/17271
Full metadata record
DC FieldValueLanguage
dc.contributor.authorJayaswal, Sachin
dc.contributor.authorAgarwal, Prashant
dc.date.accessioned2016-01-07T08:47:43Z
dc.date.available2016-01-07T08:47:43Z
dc.date.copyright2014
dc.date.issued2014
dc.identifier.citationJayaswal, S., & Agarwal, P. (2014). Balancing U-shaped assembly lines with resource dependent task times: A Simulated Annealing approach. Journal of Manufacturing Systems, 33(4), 522-534.en_US
dc.identifier.issn0278-6125
dc.identifier.urihttp://hdl.handle.net/11718/17271
dc.description.abstractThe advent of Just-in-Time (JIT) and Group Technology philosophies has popularized U-shaped assembly lines, which help overcome many of the disadvantages, like line inflexibility, job monotony, large inventories, etc., typically associated with straight assembly lines. Although U-shaped layout has demonstrated its supremacy over the traditional straight layout, the problem of U-shaped assembly line balancing (ULB) is much more complex. The extant literature on ULB assumes that each assembly task requires a fixed (or no) equipment and a fixed number of workers. However, it is often desirable to reduce certain task times by assigning more workers or alternative equipments at a given workstation. The problem in such cases is to assign not only the task but also resource alternatives (number of workers and equipment type) to workstations. Research on such resource dependent U-shaped assembly line balancing (RDULB) is scarce. We address the problem of RDULB and propose a Simulated Annealing (SA) based metaheuristic, which gives optimal solution for most of the small-to-medium problem instances. For very large problems, while SA generates a good feasible solution within half an hour to 1.5 h, Cplex is unable to find a single feasible solution even after 10 times the CPU time required by SA.en_US
dc.language.isoenen_US
dc.publisherElsevieren_US
dc.subjectAssembly line balancingen_US
dc.subjectResourceen_US
dc.subjectOptimizationen_US
dc.subjectSimulated Annealingen_US
dc.titleBalancing U-shaped assembly lines with resource dependent task times: a simulated annealing approachen_US
dc.typeArticleen_US
Appears in Collections:Journal Articles

Files in This Item:
File Description SizeFormat 
Balancing UShaped assembly lines_jayaswal2014.pdf
  Restricted Access
1.09 MBAdobe PDFView/Open Request a copy


Items in IIMA Institutional Repository are protected by copyright, with all rights reserved, unless otherwise indicated.