Please use this identifier to cite or link to this item:
http://hdl.handle.net/11718/6218
Title: | Maintenance Scheduling of Railway Coaching Stock: A Case of Ahmedabad |
Authors: | Korgaonkar, M. G. Raghuram, G. |
Keywords: | Maintenance Management;Rail Transportation;Production Management;Production Management |
Issue Date: | 26-Jul-2010 |
Abstract: | This case describes the maintenance requirements of various passenger trains terminating and originating at Ahmedabad. Based on these requirements, a maintenance schedule must be drawn up, keeping in mind the availability of maintenance facilities. |
URI: | http://hdl.handle.net/11718/6218 |
Appears in Collections: | Cases and Notes |
Files in This Item:
There are no files associated with this item.
Items in IIMA Institutional Repository are protected by copyright, with all rights reserved, unless otherwise indicated.