Please use this identifier to cite or link to this item: http://hdl.handle.net/11718/6501
Title: Indian Airlines: Caravelle Maintenance Planning
Authors: Kalro, A. H.
Narayanan, N.
Keywords: Air Transport
Issue Date: 28-Jul-2010
Abstract: The case depicts a maintenance planning and scheduling problem for the Caravalle aircraft fleet of Indian Airlines. Major inspections and maintenance required to be carried out after a specified number of flying hours are described. The objective is to develop preventive maintenance schedules to ensure proper utilization of the available resources and uniform workloads as well as timely availability of aircraft for the flight schedules.
URI: http://hdl.handle.net/11718/6501
Appears in Collections:Cases and Notes

Files in This Item:
There are no files associated with this item.


Items in IIMA Institutional Repository are protected by copyright, with all rights reserved, unless otherwise indicated.