Please use this identifier to cite or link to this item:
http://hdl.handle.net/11718/7112
Title: | Materials Requirements Planning at Hydraulics International Limited |
Authors: | Rao, V. Venkata |
Keywords: | Production Management;Assembly lines |
Issue Date: | 9-Aug-2010 |
Abstract: | The case describes the existing assembly practices in a company where a single man assembles each unit of a machine from the beginning to the end. The company wants to introduce an assembly line, making use of the heuristic method of assembly line balancing. |
URI: | http://hdl.handle.net/11718/7112 |
Appears in Collections: | Cases and Notes |
Files in This Item:
There are no files associated with this item.
Items in IIMA Institutional Repository are protected by copyright, with all rights reserved, unless otherwise indicated.