Please use this identifier to cite or link to this item: http://hdl.handle.net/11718/7112
Full metadata record
DC FieldValueLanguage
dc.contributor.authorRao, V. Venkata-
dc.date.accessioned2010-08-09T03:48:58Z-
dc.date.available2010-08-09T03:48:58Z-
dc.date.copyright1994-
dc.date.issued2010-08-09T03:48:58Z-
dc.identifier.urihttp://hdl.handle.net/11718/7112-
dc.description.abstractThe case describes the existing assembly practices in a company where a single man assembles each unit of a machine from the beginning to the end. The company wants to introduce an assembly line, making use of the heuristic method of assembly line balancing.en
dc.language.isoenen
dc.subjectProduction Managementen
dc.subjectAssembly linesen
dc.titleMaterials Requirements Planning at Hydraulics International Limiteden
dc.typeCases and Notesen
Appears in Collections:Cases and Notes

Files in This Item:
There are no files associated with this item.


Items in IIMA Institutional Repository are protected by copyright, with all rights reserved, unless otherwise indicated.