Please use this identifier to cite or link to this item: http://hdl.handle.net/11718/7339
Full metadata record
DC FieldValueLanguage
dc.contributor.authorChandra, Pankaj-
dc.date.accessioned2010-08-12T06:54:48Z-
dc.date.available2010-08-12T06:54:48Z-
dc.date.copyright1996-
dc.date.issued2010-08-12T06:54:48Z-
dc.identifier.urihttp://hdl.handle.net/11718/7339-
dc.description.abstractNational Semiconductor Co. is unable to meet the growing demand of the customers in spite of having adequate, production capacity. The manufacturing manager is trying to develop a planning system that will schedule production effectively. The pressure of both batch and discrete processors on the manufacturing line further complicates the problem. This case can be used to illustrate how shop floor synchronization can lead to reduction in lead times and thereby utilize production capacity efficiently.en
dc.language.isoenen
dc.subjectElectronicsen
dc.titleNational Semiconductor Company: Module Manufacturing Uniten
dc.typeCases and Notesen
Appears in Collections:Cases and Notes

Files in This Item:
There are no files associated with this item.


Items in IIMA Institutional Repository are protected by copyright, with all rights reserved, unless otherwise indicated.