Please use this identifier to cite or link to this item: http://hdl.handle.net/11718/7612
Full metadata record
DC FieldValueLanguage
dc.contributor.authorTripathy, A.
dc.contributor.authorSastry, Trilochan
dc.contributor.authorKalro, A. H.
dc.date.accessioned2010-08-18T03:44:44Z
dc.date.available2010-08-18T03:44:44Z
dc.date.copyright1999
dc.date.issued2010-08-18T03:44:44Z
dc.identifier.urihttp://hdl.handle.net/11718/7612
dc.description.abstractThe case illustrates an operation management problem in a manufacturing process that involves batch production and the use of a furnace, requiring very long heat treatment time. The case allows the class to do bottleneck analysis and explore several alternatives for improving productivity and output. Finally, it also illustrates the idea of shifting bottlenecks when productivity improvements are made.en
dc.language.isoenen
dc.subjectMosquito Coilsen
dc.titleInternational Cosmetics Limiteden
dc.typeCases and Notesen
Appears in Collections:Cases and Notes

Files in This Item:
There are no files associated with this item.


Items in IIMA Institutional Repository are protected by copyright, with all rights reserved, unless otherwise indicated.