Please use this identifier to cite or link to this item:
http://hdl.handle.net/11718/783
Title: | Permutation flowshop scheduling with earlines and tradiness penalties |
Authors: | Mehta, Peeyush Chandra, Pankaj Tirupati, Devanath |
Keywords: | Just-in-time manufacturing;Production scheduling;Flowshop scheduling;Earliness and Tardiness penalties |
Issue Date: | 16-Jan-2010 |
Series/Report no.: | W.P.;1834 |
Abstract: | The permutation flowshop scheduling problem with earliness and tardiness penalties (E/T) and common due date of jobs. Large number of process and discrete parts industries flow flowshop type of production process. There are very few results reported for multi-machine E/T scheduling problems. We show that the problem can be sub-divide into three groups- one, where the due date is such that all jobs are necessarily tardy; the second, where the due date is such that it is not tight enough to act as constraint on scheduling decision; and the third is a group of problems where the due date is in between the above two. We develop analytical results and heuristics are reported. Most of the problems in this research are addressed for the first time in the literature. For problems with existing heuristics, the heuristic solution is found to perform better than the existing results. |
URI: | http://hdl.handle.net/11718/783 |
Appears in Collections: | Working Papers |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
WP 2004_1834.pdf | 1.33 MB | Adobe PDF | View/Open |
Items in IIMA Institutional Repository are protected by copyright, with all rights reserved, unless otherwise indicated.