Title: Permutation flowshop scheduling with earlines and tradiness penalties
Authors: Mehta, Peeyush
Chandra, Pankaj
Tirupati, Devanath
Keywords: Just-in-time manufacturing;Production scheduling;Flowshop scheduling;Earliness and Tardiness penalties
Issue Date: 16-Jan-2010
Series/Report no.: W.P.;1834
Abstract: The permutation flowshop scheduling problem with earliness and tardiness penalties (E/T) and common due date of jobs. Large number of process and discrete parts industries flow flowshop type of production process. There are very few results reported for multi-machine E/T scheduling problems. We show that the problem can be sub-divide into three groups- one, where the due date is such that all jobs are necessarily tardy; the second, where the due date is such that it is not tight enough to act as constraint on scheduling decision; and the third is a group of problems where the due date is in between the above two. We develop analytical results and heuristics are reported. Most of the problems in this research are addressed for the first time in the literature. For problems with existing heuristics, the heuristic solution is found to perform better than the existing results.
URI: http://hdl.handle.net/11718/783
Appears in Collections:Working Papers

Files in This Item:
File Description SizeFormat 
WP 2004_1834.pdf1.33 MBAdobe PDFView/Open


Items in IIMA Institutional Repository are protected by copyright, with all rights reserved, unless otherwise indicated.