Please use this identifier to cite or link to this item:
http://hdl.handle.net/11718/7943
Title: | LTTIL: Coimbatore Bypass Project |
Authors: | Raghuram, G. Kheskani, Deepa |
Keywords: | Road;Public Systems |
Issue Date: | 25-Aug-2010 |
Abstract: | This case study discusses various issues in toll based BOT projects. L&T Transportation Infrastructure Limited (LTTIL), the BOT operator has been facing financial problems, experiencing a difficult time collecting tolls from the Athupalam Bridge segment of the Coimbatore Bypass project. Though, LTTIL and the Government have been trying to resolve the problem, no positive solution has been arrived at as yet. The future course of action needs to be examined. |
URI: | http://hdl.handle.net/11718/7943 |
Appears in Collections: | Cases and Notes |
Files in This Item:
There are no files associated with this item.
Items in IIMA Institutional Repository are protected by copyright, with all rights reserved, unless otherwise indicated.