Please use this identifier to cite or link to this item: http://hdl.handle.net/11718/7944
Full metadata record
DC FieldValueLanguage
dc.contributor.authorRaghuram, G.-
dc.contributor.authorSinha, Piyush Kumar-
dc.date.accessioned2010-08-25T11:17:57Z-
dc.date.available2010-08-25T11:17:57Z-
dc.date.copyright2003-
dc.date.issued2010-08-25T11:17:57Z-
dc.identifier.urihttp://hdl.handle.net/11718/7944-
dc.description.abstractIn April 2001 Canto Systems embarked on a project to deliver a comprehensive integrated system that would cater to magazine company, ABC Inc.’s, order processing, accounting and operational needs. CSL chose the “ Waterfall Methodology “ to develop the system that would have a phased approach with intermediate deliverables. One month into the project, the CSL team was still unable to complete the data gathering phase. The ABC management and staff felt CSL was not getting the right perspective from the data they were collecting. There was a gap in the understanding of the purpose, and hence, the expectations. There was, also, the issue of whether the customer’s requirements had been properly understood. At the review, in My 2001, the CSL team was contemplating whether it would be better to switch to the “Helix Methodology “ that had an iterative process model, in which the final system was developed in several iterations, and whether this method would be able to reduce the perceived risks.en
dc.language.isoenen
dc.subjectSystems Integrationen
dc.subjectRetailingen
dc.titleChoice of Methodology for Software Solution at ABC Inc.en
dc.typeCases and Notesen
Appears in Collections:Cases and Notes

Files in This Item:
There are no files associated with this item.


Items in IIMA Institutional Repository are protected by copyright, with all rights reserved, unless otherwise indicated.