Now showing items 1-3 of 3

    • A cooperative quay crane-based stochastic model to estimate vessel handling time 

      Dhingra, Vibhuti; Roy, Debjit; de Koster, Rene B. M. (Springer, 2017)
      Having a good estimate of a vessel’s handling time is essential for planning and scheduling container terminal resources, such as berth positions, quay cranes (QCs) and transport vehicles. However, estimating the expected ...
    • Modeling emergency evacuation with time and resource constraints: a case study from Gujarat 

      Roy, Debjit; Dhingra, Vibhuti (Elsevier Ltd, 2015)
      This study develops an off-site emergency response plan for a nuclear power plant in Gujarat, India subject to time constraints with resource limitations and risk of radiation exposure to victims. We formulate an optimization ...
    • A two-level stochastic model to estimate vessel throughput time 

      Roy, Debjit; Dhingra, Vibhuti; de Koster, Rene (College Industry Council on Material Handling Education (CICMHE): Charlotte, NC, 2014)
      A good estimate of the vessel sojourn time is essential for better planning and scheduling Of container terminal resources,such as berth scheduling,quay crane(qc)assignment And scheduling,and fleet size planning. ...