Search
Now showing items 1-10 of 16
It's Time the Indian Railways Changed Track
(2010-07-21)
Structuring the Dedicated Freight Corridor Project A Lost Opportunity
(2013-11-21)
A new large railway project offers opportunity for structuring in a manner that best value can be
delivered towards transportation. This is more so in the context of an existing large integrated railway
system (Indian ...
Study of the problem of improving the utilization of the non-suburban passenger fleet in Indian railways
(2010-03-14)
This paper studies the problem of improving the utilization of the non-suburban passenger fleet of the Indian Railways. The constant growth of the non-suburban passenger traffic outstrips the additions provided to the ...
Indian Railways' Computerized Passenger Reservation System
(2010-07-30)
Computerization of the Passenger Reservation System (PRS) is a key strategy in the corporate plan (1985- 2000) of the Indian Railways. As a part of this strategy, computerized PRS had been implemented in Delhi, Madras, ...
Secunderabad Passenger Reservation System
(2010-08-04)
This Case focuses on the choice for system upgradation at the Secunderabad Passenger Reservation System. This is set in the context of increasing demand in the Secunderabad PRS, due to growth in Secunderabad based reservations ...
Indian Railways: Chugging Along
(2010-11-12)
Crew scheduling in Indian railways: a case study of Vadodara division passenger train crews
(2010-03-14)
In this paper we discuss the crew scheduling problem in Indian Railways and propose a methodology to minimize crew requirements. In Particular, we deal with the scheduling of passenger train crews in Vadodara Division of ...
Simulation models to evaluate railway operating policies
(2010-03-23)
In this paper, we describe two applications of simulation models to evaluate the following railway operating policies: 1. Loco assignment at a junction, and 2. Twin single line versus orthodox double line operation. The ...