Search
Now showing items 31-40 of 42
Planning Rural Development Projects in Laos: A Guide
(2010-05-12)
A Study on Irrigation Management Transfer
(2010-07-03)
Simha Airlines: Aircraft Maintenance Scheduling
(2010-07-28)
The case describes a network model for aircraft maintenance scheduling with multiple resource constraints. Schedules are to be developed which minimize fluctuations in manpower resource requirements and the total time ...
Government Silk Filature, Chikkahalli
(2010-08-03)
The government silk filature, Chikkahalli is one of the four such units owned by the government of Karnataka. These units purchase silkworm cocoons from regulated cocoon markets and sell reeled silk in the silk exchanges. ...
Indian Airlines: Caravelle Maintenance Planning
(2010-07-28)
The case depicts a maintenance planning and scheduling problem for the Caravalle aircraft fleet of Indian Airlines. Major inspections and maintenance required to be carried out after a specified number of flying hours are ...
A Study of Negotiation Behaviour
(2010-04-07)
Limbasi Rice Mill Co-operative
(2010-08-03)
Untitled
(2010-07-02)