Search
Now showing items 1-6 of 6
Iron Ore Distribution for Steel Authority of India Limited
(2010-08-04)
This case is an application of linear programming with a transportation model structure. The objective is to arrive at an iron ore distribution plan between the sources of iron ore and the various steel plants of SAIL. ...
Control limit models for cash management in bank branches
(1992-10-01)
The objective of this study was to identify appropriate models for developing decentralized control limits for branch level cash management which minimize the relevant costs, viz. holding cost of cash and cash transfer cost.
Despatch Planning of Finished Steel Products at a Steel Plant
(2010-08-04)
The problem considered here is that of planning despatches of finished steel at Bhilai Steel Plant (BSP). The despatch decisions have a strong impact on the fluidity of the finished steel loading area and on the formation ...
International Cosmetics Limited
(2010-08-18)
The case illustrates an operation management problem in a manufacturing process that involves batch production and the use of a furnace, requiring very long heat treatment time. The case allows the class to do bottleneck ...
International Cosmetics Limited , Colombo
(2010-08-16)