Browsing Cases and Notes by Author "Kalro, A. H."
Now showing items 1-16 of 16
-
Academic Excellence in Self Reliance in Technical Education in Gujarat: Government Engineering College, Modasa
Kalro, A. H.; Sherry Chand, Vijaya; Shukla, S. R. (2010-08-16) -
Despatch Planning of Finished Steel Products at a Steel Plant
Raghuram, G.; Tripathy, A.; Shukla, P. R.; Kalro, A. H. (2010-08-04)The problem considered here is that of planning despatches of finished steel at Bhilai Steel Plant (BSP). The despatch decisions have a strong impact on the fluidity of the finished steel loading area and on the formation ... -
Government Silk Filature, Chikkahalli
Kalro, A. H.; Naik, Gopal (2010-08-03)The government silk filature, Chikkahalli is one of the four such units owned by the government of Karnataka. These units purchase silkworm cocoons from regulated cocoon markets and sell reeled silk in the silk exchanges. ... -
Indian Airlines: Caravelle Maintenance Planning
Kalro, A. H.; Narayanan, N. (2010-07-28)The case depicts a maintenance planning and scheduling problem for the Caravalle aircraft fleet of Indian Airlines. Major inspections and maintenance required to be carried out after a specified number of flying hours are ... -
Institute of Business Administration, Dhaka, University, Bangladesh
Misra, Sasi B.; Kalro, A. H. (2010-08-16) -
International Cosmetics Limited
Tripathy, A.; Sastry, Trilochan; Kalro, A. H. (2010-08-18)The case illustrates an operation management problem in a manufacturing process that involves batch production and the use of a furnace, requiring very long heat treatment time. The case allows the class to do bottleneck ... -
International Cosmetics Limited , Colombo
Kalro, A. H.; Sastry, Trilochan; Tripathy, A. (2010-08-16) -
Iron Ore Distribution for Steel Authority of India Limited
Raghuram, G.; Kalro, A. H.; Tripathy, A. (2010-08-04)This case is an application of linear programming with a transportation model structure. The objective is to arrive at an iron ore distribution plan between the sources of iron ore and the various steel plants of SAIL. ... -
Kachchh Cooperative Sunflower Oil Mill (KACSOM)
Kalro, A. H. (2010-08-05)This case provides data on manufacturing process, raw material availability, management and organization, as well as project costs. It is meant to be used as an exercise in project appraisal. -
Limbasi Rice Mill Co-operative
Kalro, A. H. (2010-08-03) -
Rang Bharti Pvt. Limited: Gomia Plant
Chandra, Pankaj; Kalro, A. H. (2010-08-13)The plant manager is concerned about the impact of increasing product variety, on the manufacturing operations, and consequently the competitiveness of the plant. The case describes the operations of a paint manufacturing ... -
Silk Weavers Cooperatives
Naik, Gopal; Kalro, A. H. (2010-08-16) -
Simha Airlines: Aircraft Maintenance Scheduling
Kalro, A. H.; Narayanan, N. (2010-07-28)The case describes a network model for aircraft maintenance scheduling with multiple resource constraints. Schedules are to be developed which minimize fluctuations in manpower resource requirements and the total time ... -
Steel Authority of India Limited
Kalro, A. H.; Shukla, P. R.; Tripathi, A.; Raghuram, G. (2010-07-30) -
Towards an Integrated Materials Management System: Christian Medical College and Hospital, Vellore
Ravichandran, N.; Kalro, A. H. (2010-08-25)The case presents the materials management issues related to a large hospital. Provides an opportunity to find a unified solution to issues related to materials function. The structure, co-ordination and processes can be ... -
Venky Toys
Kalro, A. H.; Raghuram, G. (2010-08-04)This is a two variable problem in LP that can be used as an introductory case. It also has interesting issues related to shadow process, as well as scope for discussion on marginal contribution benefit versus average ...