Now showing items 1-5 of 5

    • Eicher Tractors Limited 

      Sastry, Trilochan (2010-08-13)
      This case describes the implementation of Just-in-Time at Eicher Tractors in the mid 1980s. It also highlights the extensive preparatory work Eicher had to do before it could start implementing Just-in-Time. The case also ...
    • International Cosmetics Limited 

      Tripathy, A.; Sastry, Trilochan; Kalro, A. H. (2010-08-18)
      The case illustrates an operation management problem in a manufacturing process that involves batch production and the use of a furnace, requiring very long heat treatment time. The case allows the class to do bottleneck ...
    • International Cosmetics Limited , Colombo 

      Kalro, A. H.; Sastry, Trilochan; Tripathy, A. (2010-08-16)
    • Just in Time at Eicher Tractors 

      Sastry, Trilochan (2010-08-12)
      This case describes the implementation of Just-in-Time at Eicher Tractors in the mid 1980s. It also highlights the extensive preparatory work Eicher had to do before it could start implementing Just-in-Time. The case also ...
    • Maruti Udyog Limited: Coordinating the Supply Chain 

      Sastry, Trilochan; Chandra, Pankaj (2010-08-12)
      In order to respond to the changing auto market, MUL is trying to become more market oriented. The MD is concerned about integration within MUL's operations, i.e., marketing, manufacturing, vendor development, engineering, ...