Now showing items 1-17 of 17

    • Case: Blue Dart Express Limited 

      Bhatnagar, Subhash C. (2010-08-13)
    • Cheran Transport Corporation 

      Ravichandran, N. (2010-08-05)
    • Cheran Transport Corporation: Management of Maintenance Spares 

      Ravichandran, N. (2010-08-30)
      The central managerial and policy issue presented in the case to understand the implications of reconditioning time, inventory allocation policy, structure of the distribution system to the size of the float inventory as ...
    • Cochin International Airport Limited (A) 

      Varkkey, Biju; Raghuram, G. (2010-09-01)
      Cochin International Airport Limited (CIAL) is the first airport in the joint sector, with large-scale public participation. The new airport project was conceived as an alternative to the then existing naval airport, which ...
    • Dispute Resolution in an ROB Infrastructure Project (A) 

      Venkataraman, Krishnan (2010-09-07)
      The construction contract of a four laned Road Over Bridge (ROB) on the Mangalapuram and Udyognagar link was awarded to a contractor by the PWD (Government). The construction began in August 1999 with an expected completion ...
    • Dispute Resolution in an ROB Infrastructure Project (B) 

      Venkataraman, Krishnan (2010-09-07)
      The construction contract of a four laned Road Over Bridge (ROB) on the Mangalapuram and Udyognagar link was awarded to a contractor by the PWD (Government). The construction began in August 1999 with an expected completion ...
    • Dispute Resolution in an ROB Infrastructure Project (C) 

      Venkataraman, Krishnan (2010-09-07)
      The construction contract of a four laned Road Over Bridge (ROB) on the Mangalapuram and Udyognagar link was awarded to a contractor by the PWD (Government). The construction began in August 1999 with an expected completion ...
    • Dispute Resolution in an ROB Infrastructure Project (D) 

      Venkataraman, Krishnan (2010-09-07)
      The construction contract of a four laned Road Over Bridge (ROB) on the Mangalapuram and Udyognagar link was awarded to a contractor by the PWD (Government). The construction began in August 1999 with an expected completion ...
    • End User Computing in Shipping 

      Rao, V. Venkata (2010-08-10)
      This note summarizes the features of the following end user computing packages: 1. Spreadsheet Packages, 2. Data Management Packages, 3. Project Management Packages, 4. Presentation Software, 5. Computer-Aided Design, and ...
    • Industrial Relations at PRTC - A Case Study 

      Joseph, Jerome (2010-09-14)
    • IT Supports Total Logistics at YCH DistriPark (Singapore) 

      Ramani, K. V. (2010-08-06)
      Landscape greenery and wide roads greet visitors as they enter the S$ 20 million, 7.8 hectare complex of warehouses in the Yap Chwee Hock Distribution Park (YCH DistriPark) in Tuas, Singapore. The YCH DistriPark is equipped ...
    • A Note on Transport Sector 

      Manikutty, S.; Padmanabhan, Gita; Raghuram, G. (2010-08-03)
      The note reviews the efforts made in India's five year plans for different sectors in transportation and the recommendations made by various committees appointed by government to improve the efficiency of the transport ...
    • Pallavan Transport Corporation (B) 

      Sridharan, R. (2010-07-29)
      The case discusses the location of different kinds of facilities needed for the operation of an urban road transport corporation. A more specific focus is provided through the location-allocation problem, wherein routes ...
    • Pallavan Transport Corporation and Board Level Decision Making 

      Raghuram, G.; Sridharan, R.; Mahadevan, Vijayalakshmi (2010-07-30)
      This case examines the composition of the board of the Pallavan Transport Corporation. The members are drawn from various departments of the Tamil Nadu Government. This in turn affects the decision-making. It also brings ...
    • Pallavan Transport Corporation and the Environment 

      Raghuram, G.; Sridharan, R.; Mahadevan, Vijayalakshmi (2010-07-30)
      This case examines the interaction between the Pallavan Transport Corporation and some of the agents in the environment like the consumer, the Madras Municipal Corporation, the Madras Metropolitan Development Authority, ...
    • Pallavan Transport Corporation: A Case Study 

      Joseph, Jerome; Raghuram, G.; Sridharan, R. (2010-07-28)
      This is a comprehensive case that looks at an urban road transport undertaking. It traces the growth of the organization by examining the major decisions of the past chief executives. The current status of the organization ...
    • Road Transport Undertakings in Tamil Nadu 

      Joseph, Jerome; Raghuram, G.; Sridharan, R. (2010-07-28)
      This case describes the organizational form and structure of passenger road transport undertakings in Tamil Nadu. Since nationalization in 1971, major decisions regarding the organizational form were taken. Road transport ...