Search
Now showing items 1-3 of 3
Iron Ore Distribution for Steel Authority of India Limited
(2010-08-04)
This case is an application of linear programming with a transportation model structure. The objective is to arrive at an iron ore distribution plan between the sources of iron ore and the various steel plants of SAIL. ...
Despatch Planning of Finished Steel Products at a Steel Plant
(2010-08-04)
The problem considered here is that of planning despatches of finished steel at Bhilai Steel Plant (BSP). The despatch decisions have a strong impact on the fluidity of the finished steel loading area and on the formation ...
Steel Authority of India Limited
(2010-07-30)