• Login
    View Item 
    •   IIMA Institutional Repository Home
    • Faculty Publications (Bibliographic)
    • Cases and Notes
    • View Item
    •   IIMA Institutional Repository Home
    • Faculty Publications (Bibliographic)
    • Cases and Notes
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Project Planning and Scheduling for Implementation

    Thumbnail
    Date
    2010-08-03
    Author
    Korgaonkar, M. G.
    Metadata
    Show full item record
    Abstract
    This note deals with planning and scheduling implementation of projects. It begins by considering the Work Breakdown Structure (WBS) of a project as a fundamental requirement for development of planning and scheduling systems. Various methods of structuring the WBS of projects are first discussed at length, including ways of establishing coding structures. A conceptual framework for designing a planning and scheduling system is then put forth. The note next discusses typical types of project schedules. These considerations are integrated in the design of two types of planning and scheduling systems, multi-level scheduling and dual, multi-level scheduling. Finally the problem of planning and scheduling is viewed from the point of owner and contractor respectively.
    URI
    http://hdl.handle.net/11718/6852
    Collections
    • Cases and Notes [2722]

    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV
     

     

    Browse

    All of IIMA Institutional RepositoryCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    Login

    Statistics

    View Usage Statistics

    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV