• Login
    View Item 
    •   IIMA Institutional Repository Home
    • Faculty Publications (Bibliographic)
    • Cases and Notes
    • View Item
    •   IIMA Institutional Repository Home
    • Faculty Publications (Bibliographic)
    • Cases and Notes
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Materials Requirements Planning at Hydraulics International Limited

    Thumbnail
    Date
    2010-08-09
    Author
    Rao, V. Venkata
    Metadata
    Show full item record
    Abstract
    The case describes the existing assembly practices in a company where a single man assembles each unit of a machine from the beginning to the end. The company wants to introduce an assembly line, making use of the heuristic method of assembly line balancing.
    URI
    http://hdl.handle.net/11718/7112
    Collections
    • Cases and Notes [2722]

    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV
     

     

    Browse

    All of IIMA Institutional RepositoryCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    Login

    Statistics

    View Usage Statistics

    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV