Materials Requirements Planning at Hydraulics International Limited
Abstract
The case describes the existing assembly practices in a company where a single man assembles each unit of a machine from the beginning to the end. The company wants to introduce an assembly line, making use of the heuristic method of assembly line balancing.
Collections
- Cases and Notes [2722]